Down the line
Stand at one end post and shoot the full run. One frame shows grade and what is growing or parked in the way, but it does not prove length. Exact quotes still use a direct measurement or site confirmation.
Fence work prices off the run, the gates, and what the ground does in between. Mason asks the customer for those three, in that order, and builds the quote from your per-foot rates — or hands you the job when the line itself is the question.
Join the waitlistEvery one of these can be answered by walking the line, counting, or holding a tape. None of them ask a homeowner to know fence spacing or do a takeoff.
Feet of fence is the base unit. A step count can start a range, but an exact quote needs a direct measurement or site confirmation.
Corner, end and gate posts are braced differently and cost more than line posts. A hundred feet with five corners is not a hundred feet.
A walk gate and a drive gate are different posts, different hardware and different hours. Gates are the most expensive feet on the job.
Grade decides stepped panels or racked panels, taller posts on the low side, and how much material gets cut.
Tear-out is its own line. Posts in concrete are a different day than posts in dirt.
Anything in the way turns machine digging into hand digging on those holes.
A 30-inch side gate means posts, concrete and the auger go through by hand, or a section of fence comes out first.
Your rate sheet already prices these. The customer picks from what you sell, not from a catalog somebody else wrote.
It does not settle the property line, but it tells you whether a second household is part of the conversation before a crew shows up.
On a fence job the camera is doing measurement work. Each shot answers a question your estimator would otherwise ask on the phone, twice.
Stand at one end post and shoot the full run. One frame shows grade and what is growing or parked in the way, but it does not prove length. Exact quotes still use a direct measurement or site confirmation.
One photo per corner. Corners are where post count, bracing and panel cuts get decided, and they are the easiest thing to miscount over the phone.
Photograph what the gate swings into. A gate over falling ground has to swing uphill, get trimmed short, or move somewhere else.
Close enough to see whether the old posts appear to be in concrete and what is visible at grade. A photo cannot show how much post or concrete is below ground, so uncertain tear-out comes back for site confirmation.
Shoot the narrowest point with a tape in the frame. That measurement decides whether equipment reaches the work or the crew does.
Grass, gravel, exposed rock, tree roots, or a slab. Rock and roots are per-hole money, and they never show up in a wide shot.
Locate flags, the gas meter, irrigation heads and any dog-fence wire. Anything the crew digs around belongs in a photo before it becomes a surprise on install day.
Mason reads the rate sheet you already use and asks the customer for the numbers that sheet needs. More on that in how quoting works.
Fence prices in linear feet by material and height, and very little else does. Gates price per gate with their hardware. Posts follow your spacing, with corner, end and gate posts called out apart from line posts. Tear-out and haul-off price in feet. A short run hits your minimum, because a two-hour job still ties up a truck and a crew.
Grade adds panels, taller posts on the low side and cut time. Rock or hardpan turns a five-minute hole into a twenty-minute hole, which is why most sheets carry a per-hole adder instead of a bigger per-foot number. Footing depth follows your frost line. Narrow access means concrete arrives by wheelbarrow. Old posts in concrete price by the post, not by the foot.
A directly measured run, in a material you stock, with site conditions the photos show clearly or your team confirms, can come back as an exact quote from your prices. A step count, a photo-derived length, or anything softer comes back as a price range, a note that your team is reviewing it, or a request for an on-site look. Mason does not invent a rate you never set.
These come back to your office every time. A quoting tool that claims otherwise is writing checks your crew has to cash on install day.
No photo says whether the fence goes on the line, a foot inside it, or on the neighbor's dirt. That answer comes from a plat, a survey, or a conversation between two households.
Locates cover public utilities. The irrigation main, the low-voltage lighting, the gas run out to the grill and the line somebody trenched to a shed all sit past the meter, unmarked, until an auger finds them.
HOA architectural review and local setback rules can decide height, style and which way the finished face points. That is a paperwork clock, not a price, and it is the most common reason a signed fence job sits.
A leaning section looks the same whether the post rotted, the footing heaved, or a car found it. Repairs need your eyes, so Mason routes them to you instead of guessing.
140 feet of six-foot cedar privacy, four corners, one walk gate, old chain link coming out. The photos show a 34-inch side gate and ground that drops away across the back run. Mason prices the feet, the gate and the tear-out from that company's own sheet, adds their stepped-panel line for the drop, and notes the 34-inch access so the crew brings the hand auger. The neighbor's fence on the north line goes to the office as a question, not as a price.
Booking fence work is not about open slots. It is about locates, concrete and approvals lining up in the right order. Scheduling is on the way; quoting and follow-up ship today.
Utility locates come back on their own clock, usually a few working days. The dig date follows the locate, not the customer's weekend.
Posts get set and plumbed, the concrete sets, then rails and pickets go on. Fast-set gets plenty of crews through both in a day — a heavy drive gate still does not get hung on green concrete.
Rain is workable until the holes hold water. Frozen ground stops an auger cold, and frost depth changes how deep the hole has to be in the first place.
Panels, posts and concrete get dropped before day one. Somebody has to pick the spot, because a pallet in the driveway is a week of the customer parking on the street.
A residential run moves with two. Demo day wants a third body and a trailer, and the transfer station closes when it closes.
Permit review and HOA architectural approval run on their own calendar and can decide height, style, and which way the finished face points. Booking a crew before the answer comes back is how a week goes empty.
The phone starts the week the ground thaws — new dogs, new pools, new neighbors — and the list stacks up faster than the crews clear it.
Plenty of fence crews pour the flatwork and come back for the planting too. If that is your shop, read the concrete and landscaping pages — posts go in before the concrete, and the concrete cures before anybody plants.
No, and it will not pretend to. The customer gets a range or a note that your team is reviewing the job, with the measurements and photos already collected so your call is a short one.
Mason asks whether the ground falls away and asks for the photo that shows it from the side. If you price stepped and racked runs differently, it quotes them the way you priced them. A drop steep enough to change post heights goes to your review instead.
No. Repair pricing depends on why the fence failed, and a photo of a leaning panel does not say whether the post rotted, the footing heaved, or somebody backed into it. Repairs come to you with the customer's photos and address attached.
Gates come across as their own lines, with the width the customer measured and a photo of what the gate swings into. If you sell three gate builds, the customer sees your three.